1300 66 00 75
  0414 797 227

BEP Battery Cluster & VSR (2 eng. 3 bat.) Inboard-Outboard

Be the first to review this product


Regular Price: AU$601.22

Special Price: AU$470.40


Quick Overview

717 Battery Distribution Cluster Inboard/Outboard twin installation.
Not suited for High performance battery sensed alternators over 100amps

BEP Battery Cluster & VSR (2 eng. 3 bat.) Inboard-Outboard

Double click on above image to view full picture

Zoom Out
Zoom In


Twin engine battery charging made easy!

This system is designed to provide automatic battery management for twin Inboard or outboard installations using outboards without AUX outputs. It is a pre-assembled module with solid links and application labels. Provides independent isolation of port start, starboard start and house batteries with the ability to emergency parallel both starting batteries, combined with a 100 amp VSR connected to each engine. It will control the port engine to charge the port start battery first and then the house battery when the port start battery is fully charged (refer 113646, for operation of VSR). It will also control the starboard engine to charge the starboard start battery first and then charge the house battery when the starboard start battery is fully charged, giving a combined charge from both engines to the house battery until the voltage regulators of both engines control the charge. It will also allow the house battery to be charged if running on one engine.

Additional Information

SKU 113687
Featured product N/A
Video No

Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.